
Senior Construction Scheduler
October 30, 2023
TOP/CQV Senior Project Manager
October 30, 2023
Website BN Builders
Collaborative people. Progressive builders.
JOB RESPONSIBILITIES:
Exercise general supervision of multiple job sites to monitor and manage projects during each phase of construction; including but not limited to pre-construction, construction, closeout, and post-construction.
Understand and implement accepted planning and scheduling best practices.
Plan and coordinate scheduling activities of a project.
Work closely with Superintendents, Project Managers, and other team members to develop and maintain schedules in all phases of a project.
Provide training on P6 and scheduling techniques.
Analyze drawings, specifications, and contracts in the preparation and acceptance of usable baseline schedules for construction.
Support the development of bid and proposal schedules with Executive management.
Utilize analytics to identify and report on project trends.
Effectively cost and manpower load schedules for use during the execution of the project.
Evaluate the actual construction status relative to proposed plan.
Analyze and communicate the impact of changes to the schedule.
Prepare Time Impact Analyses per recommended practices by commonly accepted standards.
Approximately 20% travel based on need.
Other duties as assigned.
QUALIFICATIONS:
Undergraduate degree in Engineering, Architecture, Construction Management, or a related discipline.
10+ years scheduling experience on commercial construction projects, cGMP and Life Sciences
Proven success implementing strategic initiatives.
Advanced proficiency in Primavera P6 software.
Detail-oriented and can manage priorities in a fast-paced environment with minimal guidance.
Skilled at developing and maintaining relationships with owners, subcontractors, senior leaders, and project teams.
High degree of initiative, personal responsibility, and integrity.
PHYSICAL DEMANDS: The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.
Capable of traversing over construction-type terrain when under development; moving through the construction site and the materials in place for use on the site; climbing ladders and temporary stairways; conducting visual inspections of quality of construction and materials being used in construction. Conduct jobsite walks to ensure successful project completion. Conduct jobsite walks to identify and eliminate safety hazards.
WORK ENVIRONMENT: The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.
BNB believes in collaboration, team building, and a strong supervisor/employee relationship. To accomplish this, the duties of this role are not performed in a remote capacity, and we expect that all employees will complete work in an office/job site setting.
To apply for this job please visit www.paycomonline.net.